Karnataka Reroutes Bengaluru Tunnel Road Away From Lalbagh

The Karnataka government has formally shelved its plan to acquire around six acres of Lalbagh Botanical Garden for Bengaluru's proposed 17.6 km Hebbal-to-Silk-Board tunnel road, Greater Bengaluru Development Minister Krishna Byre Gowda said, according to Swarajya and The Economic Times. Bengaluru Smart Infrastructure Ltd (B-SMILE) is now surveying one or two alternative entry and exit alignments, including potential routes near Siddapura and Wilson Garden, after months of public opposition under the "Save Lalbagh" campaign, Swarajya and ET Infra reported.
Park Protection, Costs, and Contractor Talks
The earlier alignment would have used roughly six acres inside Lalbagh for entry and exit ramps and a tunnel boring machine launch site, prompting fears over the garden's three-billion-year-old Peninsular Gneiss rock formation and an August 2026 human chain protest around Lalbagh Rock, Swarajya noted. The state government had previously withdrawn the Karnataka Parks Conservation Amendment Bill after opposition parties accused it of enabling park-land diversion for infrastructure, Swarajya added. Gowda stated that while a longer revised route could increase total project costs, toll charges would not be raised, and a committee headed by the Chief Secretary with Finance and Public Works officials has held one or two rounds of negotiations with lowest bidder Adani Group to manage costs ahead of the state's planned Rs 7,000 crore contribution for the Esteem Mall-to-Central Silk Board corridor, Swarajya and ET Infra reported. The contract for the proposed tunnel road connecting Central Silk Board and Hebbal has not yet been awarded even though Adani Enterprises emerged as the lowest bidder for both packages, according to The South First. Adani Enterprises quoted ₹22,267 crore for the Bengaluru tunnel road project, about ₹4,600 crore above the Karnataka government's estimated project cost of around ₹17,698 crore, according to The South First.
Opposition Demands and Wider Mobility Objections
Gowda said every alternative location carries trade-offs and that the final alignment will follow feasibility studies and stakeholder consultations, ET Infra reported. BJP MP Tejasvi Surya welcomed the Lalbagh shift as a "partial victory" for citizens, but urged the government to release project assessments publicly, citing congestion concerns raised by Indian Institute of Science and other experts, ET Infra reported. Surya also alleged that the proposed Hebbal Short Tunnel threatens over 3.4 acres of Hebbal Lake and flagged the dropping of the Red Line Metro's Veterinary College station, calling for an empowered Bengaluru Metropolitan Land Transport Authority and greater investment in Metro, suburban rail, buses, and last-mile connectivity. Gowda reiterated that the government stands by its commitment to move the tunnel away from Lalbagh, ET Infra reported. Surya added that he would continue supporting citizen efforts to protect Bengaluru's lakes, parks, and public spaces while pressing for sustainable urban mobility solutions, ET Infra reported. An Indian Institute of Science (IISc) expert panel led by Prof Ashish Verma termed the proposed Hebbal-to-Silk Board tunnel road unscientific and warned that it could increase the risk of flooding, according to The Federal.
