Gadkari Announces Rs 1 Lakh Crore Highway Package for West Bengal

By The Indus Pulse Editorial Team4 min read
An aerial view of a complex multi-level highway interchange with cars driving during sunset
AI illustrationCreated for The Indus Pulse with AI tools

Union Road Transport and Highways Minister Nitin Gadkari on Thursday, November 26, announced Rs 1 lakh crore in road infrastructure projects for West Bengal at an event in Kolaghat in Purba Medinipur alongside Chief Minister Suvendu Adhikari, pledging that the state's highways would match American standards within five years, according to The Hindu, Deccan Chronicle, and The Indian Express. At Kolaghat, Gadkari opened and laid foundation stones for 22 projects valued at Rs 8,700 crore, while Adhikari said West Bengal was set to receive Rs 25,000 crore in centrally funded road projects on Thursday and assured full land availability, The New Indian Express and The Hindu reported.

Kolkata Ring Road, Expressways, and Hill Corridors

Among the headline approvals, Gadkari detailed a 250-km Kolkata Ring Road worth Rs 14,000 crore linking Kolkata with Howrah, North 24 Parganas, and South 24 Parganas and integrating the Kona, Belghoria, and Kalyani Expressways, urging the state to hire international experts to prepare its detailed project report using Nagpur- and Pune-style single-pillar multi-tier flyover and metro structures, The Indian Express and The Hindu reported. The package also includes the 58-km Dankuni-Kolaghat eight-lane highway worth Rs 20,000 crore, the 820-km six-lane Varanasi-Kolkata Greenfield Expressway worth Rs 75,000 crore (with 235 km costing Rs 30,000 crore in West Bengal, cutting travel from 12 hours to five), the 570-km Gorakhpur-Siliguri Expressway worth Rs 38,000 crore (cutting 14 hours to six), and the 400-km Siliguri-Guwahati High-Speed Corridor worth Rs 26,000 crore (cutting 10 hours to four). Gadkari further listed the 270-km Raxaul-Haldia Expressway (Rs 17,000 crore in West Bengal for Nepal cargo transit), the 245-km Moregram-Kishanganj link (Rs 12,000 crore), a Rs 521.20 crore four-lane Ganga bridge at Farakka, six-laning of NH-19's Palsit-Dankuni stretch, Rs 10,000 crore for urban beautification, and two hill corridors from Siliguri to Darjeeling (77 km, Rs 6,000 crore) and Siliguri to Sikkim (52 km, Rs 6,000 crore), each reducing travel from three hours to one hour, The Indian Express and The Hindu reported. According to a Press Information Bureau release citing Union Minister Nitin Gadkari, the Varanasi–Ranchi–Kolkata alignment received West Bengal's consent on January 3, 2023, and a revised alignment requested by the state was approved in October 2024. The announced Barasat–Petrapole four-lane highway spans 75 km at an estimated cost of ₹8,000 crore to strengthen cross-border connectivity with Bangladesh, according to Press Information Bureau. As of August 20, 2025, Section 3(A) land-acquisition notification under the National Highway Act, 1956 for the Varanasi–Kolkata Expressway had been completed in Purulia, Bankura, and Hooghly districts out of six districts in West Bengal, according to Press Information Bureau. The six-laned Palsit–Dankuni section of NH-19 inaugurated on November 26, 2026 spans 63.83 km, connecting Howrah, Hooghly, and Burdwan along the Kolkata–Durgapur industrial corridor, according to Press Information Bureau. On November 26, 2026, Gadkari announced a 7-km, six-lane elevated road on the Belgharia Expressway at an estimated cost of ₹1,000 crore to improve access to Netaji Subhas Chandra Bose International Airport and ease traffic between North Kolkata and NH-19, according to Press Information Bureau. Gadkari also announced the widening of 106.61 km of NH-512 between Gazole and Hili at a cost of ₹3,000 crore, according to Press Information Bureau.

Existing Pipeline and Land Acquisition Push

Gadkari stated that 2,400 km of highways worth Rs 40,000 crore have already been completed in West Bengal and 450 km worth Rs 35,000 crore are underway alongside a Rs 2 lakh crore broader pipeline. After holding follow-up talks with Adhikari at the state secretariat Nabanna, Gadkari urged the state government to speed up land acquisition, forest clearances, and encroachment removal ahead of his scheduled return in six months, Deccan Chronicle and The Indian Express added.

Sources & Citations

Spotted an error in this article? Tell us and we will check it.